AT FOUR CONSTRUCTION SITES IN VIRGINIA, THREE CONSTRUCTION SITES IN MARYLAND, FOUR CONSTRUCTION SITES IN PENNSYLVANIA, AND ONE CONSTRUCTION SITE IN WASHINGTON, D.C. WHERE THE TURNER OR TOMPKINS WAS THE OPERATOR, THE RESPONDENT VIOLATED REQUIREMENTS OF THE APPLICABLE GENERAL NPDES STORMWATER PERMITS. VIOLATIONS AT THE VARIOUS SITES INCLUDE DISCHARGING WITHOUT AN NPDES PERMIT, FAILING TO PROPERLY INSTALL, OPERATE AND/OR MAINTAIN EROSION AND SEDIMENTATION CONTROLS, FAILING TO KEEP THE STORMWATER POLLUTION PREVENTION PLAN ON SITE AS REQUIRED BY THE PERMIT, AND FAILING TO CONDUCT ALL THE REQUIRED SELF-INSPECTIONS.