AT FOUR CONSTRUCTION SITES IN VIRGINIA AND ONE CONSTRUCTION SITE IN MARYLAND WHERE TURNER OR TOMPKINS WAS THE OPERATOR, THE RESPONDENTS VIOLATED REQUIREMENTS OF THE APPLICABLE GENERAL NPDES STORMWATER PERMITS. VIOLATIONS AT THE VARIOUS SITES INCLUDED FAILING TO PROPERLY INSTALL, OPERATE AND/OR MAINAIN EROSION AND SEDIMENTATION CONTROLS, FAILING TO KEEP THE STORMWATER POLLUTION PREVENTION PLAN ON SITE AS REQUIRED BY THE PERMIT, AND FAILING TO DCONDUCT ALL THE REQUIRED SELF-INSPECTIONS.