On 8/4/2009, a fire occurred at the Clio facility. At the time of the fire, MPT stored 80,000 gallons of oil and other petroleum products in a warehouse and in above ground tanks. During response to this incident, EPA did not receive an SPCC Plan as required. In an Information Request Response letter dated 3/15/2012, MPT indicated that the facility had been in operation since 1999, but that no SPCC plan was in place at the time of the 8/4/2009 fire.