Respondent had not prepared an SPCC Plan in accordance with 40 CFR 112.7 and 40 CFR 112.8, in violation of 40 CFR 112.3. Respondent had not fully implemented its SPCC Plan, and had not amended it when there was a change in the facility design, construction, operation, or maintenance that materially affected its potential for a discharge.