← EPA enforcement cases

WESTINGHOUSE ELECTRIC CO LLC

Administrative - Formal · FY2014 · — · Final Order With Penalty · 3400280539

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
08-2014-0066
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

The RCRA Region 8 enforcement program reached a settlement in Principle with Westinghouse Electric Company, LLC for violations at its Western Zirconium facility (Facility) in Ogden, UT, for failure to not properly characterize certain waste streams at the facility. The Facility recovers zirconium and hafnium from zirconium oxide crystals. During the production process, magnesium chloride is also produced and is currently being sold as a useful product. However, from approximately March 2009 until November 2010, some of the magnesium chloride produced was shipped and disposed as a solid waste. The Region with assistance from HQ and NEIC performed an inspection at the facility in FY12. Information and sampling data gathered during the RCRA inspection and review of historical documents determined that Westinghouse had not properly characterized the magnesium chloride as a “reactive” hazardous waste. Region 8 engaged in extensive discussions with UDEQ and finally determined it would take the lead for enforcement of these violations. Region 8 then contacted the company to determine its interest in negotiating the issues prior to Region 8 filing a complaint.

Source

Authoritative