Summary

The Respondent failed to obtain construction stormwater permit coverage as required. The site is a 2+ acre construction site adjacent to surface waters and discharges to Highland Brook. The discharges associated with construction have been documented. The facility has obtained permit coverage, began inspections and has achieved compliance.