PSC Industrial Outsourcing, LP was generating large quantities of waste from the decontamination of offshore equipment. PSC failed to use their own EPA ID for shipments of hazardous wastes, failed to make hazardous waste determinations, and failed to comply with all Large Quantity Generator requirements.