In January 2020, Respondent operated three new 23 MW gas turbines at its Palo Seco Facility. At the time, the turbines did not have an approved operating permit. Additionally, the turbines did not operate with water injection. The installation and operation of the units resulted in a significant net increase in emissions, as defined in 40 CFR 52.21.