CAMBRIDGE ENERGY CORPORATION - L. M. HOLDING NO. 1 AND NO. 2

Administrative - Formal · FY2001 · — · — · 41541

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
06-2001-4336
Type
Administrative - Formal
Lead
EPA
Outcome
—
Multimedia
N
Self-disclosure
N

Defendants (1)

Summary

1. SECTION 311(B)(6)(B)(I) OF THE CLEAN WATER ACT ( CWA ), 33 U.S.C. SECTION 1321(B)(6)(B)(I), AS AMENDED BY THE OIL POLLUTION ACT OF 1990. 2. CAMBRIDGE ENERGY CORPORATION - L. M. HOLDING NO. 1 AND 2 SECTION 1, TOWNSHIP 11 SOUTH, RANGE 7 EAST LA PLACE, ST. JOHN THE BAPTIST PARISH, LOUISIANA 70068 3. RESPONDENT WAS IN VIOLATION OF SECTION 311(J) OF THE CWA BY: 1) NO EVIDENCE OF THREE YEAR REVIEW OF PLAN BY OWNER/ OPERATOR; 2) INSPECTIONS REQUIRED BY 40 CFR PART 112 ARE NOT IN ACCORDANCE WITH WRITTEN PROCEDURES DEVELOPED FOR THE FACILITY; 3) NO TRAINING ON THE OPERATION AND MAIN- TENANCE OF EQUIPMENT TO PREVENT DISCHARGES; 4) NO TRAIN- ING ON THE APPLICABLE LAWS, RULES, AND REGULATIONS; 5) SPILL PREVENTION BRIEFINGS ARE NOT SCHEDULED AND CONDUCT- ED PERIODICALLY; 6) FIELD DRAINAGE DITCHES, ROAD DITCHES, AND OIL TRAPS, SUMPS, OR SKIMMERS ARE REGULARLY INSPECTED FOR OIL, AND/OR OIL IS NOT REMOVED; 7) ADEQUATE RECORDS OF DRAINAGE EVENTS ARE NOT MAINTAINED; 8) MATERIALS OF CONSTRUCTION ARE NOT SUFFICIENTLY IMPREVIOUS; 9) WALLS OF CONTAINMENT SYSTEM ARE SLIGHTLY ERODED OR HAVE LOW AREAS; 10) VISUAL TANK INSPECTIONS ARE NOT CONDUCTED PERIODICAL- LY BY APPROPRIATE PERSONNEL AND/OR INSPECTIONS DO NOT IN- CLUDE TANK FOUNDATION AND SUPPORTS; 11) ABOVE GROUND VALVES AND PIPELINES ARE NOT EXAMINED PERIODICALLY ON A SCHEDULED BASIS FOR GENERAL CONDI

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown