# LINDSAY MANUFACTURING CO., LINDSAY, NE
> **Judicial** · FY1991 · — · Final Order With Penalty & Specified Cost Recovery
## Case
- **Activity ID:** `44065`
- **Case Number:** 07-1991-0137
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Penalty & Specified Cost Recovery
- **Penalty assessed:** $0
- **Cost recovery:** $19K
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- LINDSAY MANUFACTURING COMPANY (complaint) (settlement)
## Summary

THE LINDSAY MANUFACTURING CO. SITE IS AN NPL SITE LOCATED IN LINDSAY, NE.  THE SITE HAS BEEN A STATE-LEAD SITE.  THE      NEBRASKA DEPT. OF ENVIRONMENTAL CONTROL (NDEC) ENTERED INTO  A STIPULATION AND AGREEMENT WITH LINDSAY MANUFACTURING       COMPANY IN JAN. 1989 FOR PURPOSES OF LINDSAY CONDUCTING AN   RI/FS.  THE STATE PROVIDED OVERSIGHT UNDER A COOPERATIVE     AGREEMENT WITH EPA.  THE ROD WAS ISSUED ON SEPT. 28, 1990 BY EPA, REGION VII AND SELECTED AS THE REMEDIAL ACTION: 1) A    PILOT STUDY FOR , AND IF PRACTICABLE, A FULL SCALE SOIL      VAPOR EXTRACTION SYSTEM, ENHANCEMENT OF CURRENT GROUNDWATER  TREATMENT AND EXTRACTION SYSTEM AND GROUNDWATER MONITORING.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · MORVS · CC0 1.0*