10/6/00: IPC FAILED TO TIMELY INSTALL AND COMPLETE CERTIFICATION OF THE REQUIRED ACID RAIN CONTINUOUS EMISSION MONITORS (CEMS) FOR SULFOR DIOXIDE, VOLUMETRIC FLOW, NITROGEN OXIDES AND OXYGEN ON CARBON DIOXIDE ON BOILER 6 AT IPC'S STATION IN DUBUQUE, IOWA. IPC FAILED TO PERFORM THE SAME REQUIREMENTS AT UNITS 2 AT IPC'S STATION IN LANSING, IOWA.