← EPA enforcement cases

INTERSTATE POWER COMPANY

Judicial · FY2000 · — · Litigated With Penalty · 47123

$200K
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
07-2000-0676
Type
Judicial
Lead
EPA
Outcome
Litigated With Penalty
Multimedia
N
Self-disclosure
Y

Defendants (1)

Summary

10/6/00: IPC FAILED TO TIMELY INSTALL AND COMPLETE CERTIFICATION OF THE REQUIRED ACID RAIN CONTINUOUS EMISSION MONITORS (CEMS) FOR SULFOR DIOXIDE, VOLUMETRIC FLOW, NITROGEN OXIDES AND OXYGEN ON CARBON DIOXIDE ON BOILER 6 AT IPC'S STATION IN DUBUQUE, IOWA. IPC FAILED TO PERFORM THE SAME REQUIREMENTS AT UNITS 2 AT IPC'S STATION IN LANSING, IOWA.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown