FAILURE TO DISPOSE OF THE LEAKING PCBS AND CARDBORAD SATURATED WITH PCBS. FAILURE TO DISPOSE TO THE 34 PCB CAPACITORS WITHIN ONE YEAR FROM THE DATE WHEN THEY WERE FIRST PLACED INTO STORAGE TOGETHER WITH FAILURE TO PROVIDE AN ADEQUATE ROOF AND ADEQUA TE WALLS ON ITS STORAGE FOR DISPOSAL FACILITY. FAILURE TO PROPERLY MARK THE 55 GALLON DRUM.