THIS ADMINISTRATIVE ORDER ON CONSENT IS ENTERED INTO VOLUNTARILY BY THE U.S. EPA AND THE RESPONDENTS LISTED. THIS ORDER CONCERNS THE PERFORMANCE OF A REMOVAL ACTION ON THE MOUNTAINEER REFINERY SITE IN LA BARGE, LINCOLN COUNTY, WYOMING BY RESPONDENTS AND REIMBURSEMENT OF RESPONSE COSTS, NOT INCONSISTENT WITH THE NCP, INCURRED BY THE U.S. IN CONNECTION WITH THE SITE. THE ORDER CALLS FOR THE REIMBURSEMENT OF $323,526.09 IN PAST RESPONSE COSTS (THROUGH 04/29/92.) THE PENALTY IS TO BE PAID IN TWO INSTALLMENTS; ONE DUE 60 DAYS FROM THE EFFECTIVE DATE OF THE AOC FOR RA, AND THE OTHER 120 DAYS FROM THE EFFECTIVE DATE OF THIS ORDER. (EFFECTIVE DATE OF ORDER IS 10/14/92). RESPONDENTS: ACD, INC; FMC CORPORATION; GSF ENERGY, INC; GULFSTREAM AEROSPACE CORPORATION GULTON INDUSTRIES, INC; HAYDEN, INC; NELCO PRODUCTS, INC; PACIFIC SCIENTIFIC COMPANY; PAUL-MUNROE ENGINEERING; ROSAN PRODUCTS; SOUTHERN CALIFORNIA RAPID TRANSIT DISTRICT; TAYLOR-DUNN MANUFACTURING COMPANY; TEXTRON, INC; VARCO INTERNATIONAL, INC; AND THE WALT DISNEY COMPANY.