THE FACILITY IS A BUILDING WHICH IS PART OF A COMPLEX OF THREE TWO-STORY BUILDINGS. THE CEILING ON SECOND FLOOR OF THIS BUILDING WAS COVERED WITH FRIABLE ASBESTOS MATERIAL WHICH WAS REMOVED WITHOUT NOTICE TO EPA AND IN VIOLATION OF THE WORK PRACTICE PROCEDURES SET FORTH IN 40 C.F.R. PART 61, SUBPART M.