RED SHIELD WILL OPERATE OUT OF COMPLIANCE WITH HAP (METHANOL) AND TRS (TOTAL REDUCED SULFUR) LIMITS FOR A PERIOD OF UP TO 12 MONTH, WHILE INSTALLING AND TESTING EMISSION CONTROLS. THE AO REQUIRES RED SHIELD TO REACH COMPLIANCE AS EXPEDITIOUSLY AS PRACTICABLE, BUT NO LATER THAN 12 MONTHS FROM THE DATE OF ISSUANCE. THE AO ALSO REQUIRES RED SHIELD TO USE GOOD AIR POLLUTION CONTROL PRACTICES TO MINIMIZE EMISSIONS. RED SHIELD IS THE NEW OWNER OF TEH PULP MILL FORMERLY OWNED AND OPERATED BY GEORGEIA PACIFIC. GP CLOSED THE MILL IN 2006 BEORE INSTALLING CONTROLS NEEDED TO COMPLY WITH APRIL 2007 STANDARDS.