8/28/2007 - EXPEDITED SPCC SETTLEMENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $2,500. RESPONDENT FAILED TO COMPLY WITH THE SPCC REGULATIONS. SECTION 112.3-RESPONDENT HAD NO SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN; SECTION 112.8(c) - SECONDARY CONTAINMENT STRUCTURES FOR BULK STORAGE CONTAINERS (TANKS) APPEAS TO BE GROSSLY INADEQUATE, AREAS OUTSIDE OF CONTAINER NOT FREQUENTLY INSPECTED FOR SIGNS OF DETERIORATION, DISCHARGES, OR ACCUMULATION OF OIL INSIDE DIKED AREA; TANKS ARE NOT FAIL SAFE ENGINEERED; VISIBLE OIL LEAKS FROM A CONTAINER (INCLUDING BUT NOT LIMITED TO A LOSS OF OIL FROM SEAMS GASKETS, PIPING, PUMPS, VALVES, RIVETS, AND BOLTS) ARE NOT PROMPTLY CORRECTED; ACCUMULATIONS OF OIL IN DIKED AREAS IS NOT PROMPTLY REMOVED.