The facility was inspected by EPA Contractors on November 7, 2006. The Inspection Checklist was reviewed by R Jamison, EPA. The contractor noted that there was no overfill protection and that corrosion protection was not installed. . R Jamison concurred and issued a Field Citation from the desk.