VIOLATIONS: ENVIRONMENTAL PROTECTION AGENCY (EPA) REGULATIONS REQUIRE THE OWNER OR OPERATOR OF AN INJECTION WELL TO MONITOR INJECTION PRESSURE AND VOLUME AT LEAST MONTHLY AND TO REPORT MONITORING RESULTS TO THE EPA ANNUALLY. THE PERMIT FOR THE WELL ALSO REQUIRES THE ANNUAL REPORT TO INCLUDE A FLUID LEVEL MEASUREMENT FOR THE WELL IN THE ANNUAL REPORT. RESPONDENT VIOLATED OSAGE UNDERGROUND INJECTION CONTROL REGULATIONS BY FAILING TO SUBMIT A REQUIRED ANNUAL OPERATION REPORT FOR AN INJECTION WELL FOR THE PERIOD APRIL 2006 THROUGH MARCH 2007.
REMEDY: SUBMIT OVERDUE ANNUAL OPERATION REPORT FOR THE WELL WITHIN 30 DAYS AFTER THE EFFECTIVE DATE OF THE ORDER.
PENALTY: NONE