RESPONDENT VIOLATED TSCA SETON 6(e) AND 15, 15 U.S.C. SUBSECTION 2605(e) AND 2614, BY FAILING TO PERFORM QUARTERLY INSPECTIONS OF ITS PCB TRANSFORMER AS REQUIRED BY 40 C.F.R. SUBSECTION 761.30(a)(1)ix) AND FAILING TO HAVE AVAILABLE COPIES OF ANNUAL RECORDS AND ANNUAL WRITTEN DOCUMENT LOGS OF THE DISPOSITION OF PCBS AND PCB ITEMS AS REQUIRED BY C.F.R SUBSECTION 761.180(a)(1)(i) THROUGH (iii) AND 761.180(a)(2)(i) THROUGH (vi), FOR 2001, 2002, 2003 AND 2004.