CONSENT AGREEMENT AND FINAL ORDER ISSUED 1/17/2008, ASSESSING A PENALTY OF $40,000. RESPONDENT SHALL MAKE PAYMENT WITHIN THIRTY DAYS. ORDER ALLEGES: DURING THE CSWEI, EPA INSPECTORS OBSERVED THE FOLLOWING: THE AREA AROUNDTHE BOX CULVERT HAD CONCRETE MASONRY BLOCKS AND CONSTRUCTION DEBRIS DISPOSED OF WITHIN THE TRIBUTARY TO WHITE OAK CREEK, IN VIOLATION OF PART I.A.Y OF THE PERMIT. CONTROL MEASURES WERE MISSING (PERIMETER SILT FENCING ALONG THE ACCESS ROADS, OUTLET PROTECTION AT ALL OF THE OUTFALLS, IN VIOLATION OF PART I.C.1 AND PART II.C.1 OF THE PERMIT. STORM WATER CONTROLS WERE NOT MAINTAINED AND OPERATED AT OPTIMAL EFFICIENCY, INVIOLATION OF PARTS I.C.2 AND IC.1 OF THE PERMIT. SEDIMENT DISCHARGES WERE OBSERVED IN THE TRIBUTARY TO WHITE OAK CREEK AND NO CORRECTIVE ACTION WAS TAKEN, AS REQUIRED BY PARTS II.B.1 AND I.B.2 OF THE PERMIT. IN VIOLATION OF SECTIONS 301 AND 402 OF THE CWA.