MCMANUS EXCAVATING CO INC

Administrative - Formal · FY2008 · — · Final Order With Penalty · 600089606

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
01-2008-2508
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

The Respondent is a developer and a contractor at a construction site in Holden, Massachusetts, on which a residential subdivision (“Alden Woods Subdivision”) of 124 lots is being developed. The site is approximately 72 acres in size with a disturbed area of 29 acres. Because the Respondent is an operator of a site disturbing more than five acres, the Respondent was required to apply for either an individual NPDES permit or a promulgated NPDES General Permit for Storm Water Discharges from Construction Activities. The Respondent failed to seek authorization to discharge under a permit. Erosion control measures installed by the Respondent were inadequate and poorly maintained. On numerous occasions between September of 2004 and May of 2006, the Commonwealth’s Department of Conservation and Recreation staff documented discharges of sediment-laden water discharging from the Construction Site to Chaffins Brook.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown