C B BLAIR DEVELOPMENT

Administrative - Formal · FY2008 · — · Final Order With Penalty · 600089613

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
01-2008-2509
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

C.B. Blair Development Corp is a developer and a contractor at a construction site in Holden, Massachusetts, on which a residential subdivision (“Alden Woods Subdivision”) of 124 lots is being developed. The site is approximately 72 acres in size with a disturbed area of 29 acres. Because C.B. Blair was an operator of a site disturbing more than five acres, C.B. Blair was required to apply for either an individual NPDES permit or a promulgated NPDES General Permit for Storm Water Discharges from Construction Activities. The company obtained coverage over a year and a half after discharges from the construction site to Chaffins Brook, a Class A waterway, were observed. Erosion control measures installed by C.B. Blair were inadequate and poorly maintained. On numerous occasions between September of 2004 and January 2005, the Commonwealth’s Department of Conservation and Recreation staff documented discharges of sediment-laden water discharging from the Construction Site to Chaffins Brook.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown