Violations: 1.Failure to post the Storm Water Construction General Permit certification, a copy
of the Notice of Intent confirmation letter, and a brief description of the project including
the permit number. 2. Failure to develop an adequate Storm Water Pollution Prevention Plan.
3. Failure to install adequate control measures and stabilization practices at the construction site.
4. Failure to perform required inspections of the construction site.
Relief: Penalty