RESPONDENT FAILED TO INSPECT THE COMPONENTS OF THE DRY CLEANING SYSTEM AT LEAST ON A BIWEEKLY BASIS FOR PERCEPTIBLE LEAKS WHILE THE DRY CLEANING SYSTEM IS OPERATING; FAILED TO MEASURE THE TEMPERATURE OF THE AIR-PER GAS-VAPOR STREAM ON THE OUTLET SIDE OF THE REFRIGERATED CONDENSOR ON A DRY-TO-DRY MACHINE WITH A TEMPERATURE SENSOR ON A WEEKLY BASIS; FAILED TO CALCULATE THE DIFFERENCE BETWEEN THE TEMPERATURE OF THE AIR-PER GAS-VAPOR STREAM ENTERING AND EXITING THE REFRIGERATED CONDENSOR ON A WASHER WEEKLY TO DETERMINE THAT THE DIFFERENCE IS > OR = TO 200F; FAILED TO KEEP: 1) A LOGS OF THE VOLUME OF PERC THAT IS PURCHASED EACH MONTH, 2) A LOG OF THE YEARLY CONSUMPTION OF PERC THAT IS PURCHASED EACH MONTH, 3) A LOG OF THE DATES WHEN DRY CLEANING SYSTEM COMPONENTS ARE INSPECTED FOR PER- CEPTIBLE LEAKS AND THE NAME AND LOCATION OF DRY CLEANING SYSTEM COMPONENTS WHERE PERCEPTIBLE LEAKS ARE DETECTED.