**VIOLATIONS: 1) Inadequate or no prediction of equipment failure which could result in discharges; 2) Plan does not discuss appropriate containment/diversionary structures/equipment; 3) No training on the operation and maintenance of equipment to prevent discharges; 4) No training on the applicable laws, rules, and regulations; 5) Spill prevention briefings are not scheduled and conducted periodically; 6) Records of inspections of aboveground tanks are not maintained; 7) inadequate secondary containment, and/or rack drainage does not flow to catchment basin, treatment system, or quick drainage; 8) There is no interlocked warning light, physical barrier system, or warning signs to prevent vehicular departure before complete disconnect from transger lines; and 9) Plan has inadequate or no discussion of facility tank car and tank truck loading/unloading rack. **ASSESSED PENALTY: $1,150.00