'**VIOLATION: 1) Failure to submit annual operation reports. **RELIEF SOUGHT: 1) Within 30 days, submit required annual operation reports fro Well No. 2-A for the period of Oct. 1999 through Sept. 2002 and Well No. 7 for the period of Jan. through Dec. 2001.'