'Complaint filed 8/8/2002, proposing a penalty of $137,500. Respondent''s permit requires demonstration of mechanical integrity every 2 years for a temporarily abandoned injection well, or that the well be plugged and abandoned. The last mechanical integrity test conducted on Porter #2 injection well was on March 2, 1989. Respondent is required to submit annual submittal of monthly monitoring reports. The last annual monitoring report submitted to EPA was for the 12 month period from July 1999 through June 2000.