'Respondent violated Section 40 CFR Section 61.145(c)(6)(i) and Section 61.150(a)(1)(iii), by failed to wet material and ensure that it remains wet until collected for disposal and, failing to seal all asbestos material in leak tight containers while wet.'
CCDS:
Respondents violated Section 40 C.F.R. Section 61.145(c)(6)(i) and Section 40 61.150(a)(1)(iii), by failing during the stripping operation of a renovation, to adequately wet regulated asbeston material (RACM) and to seal that material in leak tight containers while wet.