Violation: Compliance evaluation inspection conducted 12/11/2002 revealed that there was no adequate wastewater retention structure, which is a violation of the CAFO general permit.
RELIEF: 1) Within 30 days, Respondent must take immediate action to prevent any discharge of pollutants and submit documentation to EPA demonstrating the facility is properly designed, constructed, operated, and maintained to contain all process-generated wasterwater plus runoff generated during the 25-year, 24-hour storm event; 2) Initiate a weekly visual inspection program to determine if discharges are occurring, and submit information concerning any discharges of pollutants from the facility within the last 5 years; and 3) within 45 days, arrange a show cause meeting with EPA.