Facility must 1) immediatel take all necessary measures to prevent any discharge of animal manure to waters of the U.S. from the facility; 2) submit documentation to EPA to demonstrate that the facility is properly designed, constructed, operated, and maintained to contain all process-generated wastewater plus runoff from a 25-year, 24-hour storm event; 3) initiate weekly inspection program to determine if any discharges are occurring and; 4) arrange for a show cause meeting with EPA.