CONSENT AGREEMENT ISSUED 2/13/03, ASSESSING PENALTIES OF $ 54,000, AGAINST THREE REGION IV FACILITIES ($17,428 PER FACILITY). THIS CASE ALSO HAD FACILITIES LOCATED IN REGIONS 2, 3, 4, 5, AND 7. RESPONDENT FAILED TO PROVIDE A LEAK DETECTION SYSTEM, FOR EACH FACILITY'S ANCILLARY EQUIPMENT, AND ITS SECONDARY CONTAINMENT, ASSOCIATED WITH THE TANK SYSTEM THAT MANAGES THE MIXTURE OF WASTE PAINTING AND PURGE SOLVENT, THAT WILL DETECT THE FAILURE OF EITHER THE PRIMARY AND SECONDARY CONTAINMENT STRUCTURE OR A RELEASE OF HAZARDOUS WASTE OR ACCUMULATED LIQUEID WITHIN 24 HOURS AS REQUIRED BY 40 C.F.R. SECTION 265.193(C) AND (F). IN VIOLATION OF RCRA SECTION 3008