← EPA enforcement cases

Middleman Construction Company, L.L.C. (TXR10VA56 & TXR10VA61)

Administrative - Formal · FY2003 · — · Unilateral Administrative Order Without Adjudication · 97192

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
06-2003-2004
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

Violation: 1. A Storm Water Program notice was posted, but it was not posted near the main entrance and the project description and the SWPPP location description which had been filled out, was now faded and could not be read. 2. The pre-construction run-off coefficient was not provided in the SWPPP. 3. The SWPPP did not contain updated locations for the sub-contractor's material or equipment storage areas. 4. The SWPPP did not contain information about the description and implementation of control measures in reference to approved State, Tribal, or Local plans. 5. The SWPPP did not contain the inspectors qualifications, and the inspection reports did not have a certification statement. 6. The SWPPP did not contain information on listed endangered or threatened species, or critical habitat.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown