On nightshift of 04-24-2026, IP experienced right forearm feeling tight, reported for work the next shift, after loading 2 rounds the IP reported loss of mobility, performed other normal duties the rest of the shift, reported to onsite clinic 4/26/26 AM, on site treatment was slow, sent off site for diagnostics, which led to restricted duty on site beginning 5/5/2026.